Search found 3 matches

by flyhigh
Thu May 26, 2016 7:25 am
Forum: VTSTTools
Topic: Question about split_dos
Replies: 3
Views: 11987

Re: Question about split_dos

[quote="graeme"]If you can post the directory with the data, I'll try to reproduce the problem and find a solution.[/quote] I checked the script "dosanalyze.pl ", and I found the error message is related to the variance. 290 $eneavg = $dstsum/$dossum; 291 $enevar = ($dssqsum*$dos...
by flyhigh
Wed May 25, 2016 9:33 am
Forum: VTSTTools
Topic: Question about split_dos
Replies: 3
Views: 11987

Question about split_dos

Hello, Recently, I downloaded the scripts "vtstscripts.tgz". I calculated d-band center of Pt surface with this, and I got the results below. Only Emax is different in the case (1) and the case (2). I do not understand the meaning of the last message,"Can't take sqrt of -415.985 at /b...
by flyhigh
Wed May 25, 2016 8:41 am
Forum: VTSTTools
Topic: Question about dosanalyze.pl
Replies: 28
Views: 62306

Re: Question about dosanalyze.pl

To graeme,

For the pradeep's question below, is "$ dosanalyze.pl e=-12.2,2.2 a 1-9" right?

I am not sure, but I think "$ dosanalyze.pl e=-12.2,2.2 d 1-9" or " or "$ dosanalyze.pl e=-12.2,2.2 1-9" is right.

Am I right?